Search results (227)
energy transition
Start of construction of heat pipeline between the port of Rotterdam and The Hague
Gasunie and the Ministry of Economic Affairs and Climate Policy have taken the final investment decision for the construction of a heat pipe
energy transition
World Hydrogen Summit coming to Ahoy in Rotterdam in March
The leading World Hydrogen Summit will take place once a year in Rotterdam from March 2022 onwards. This has been announced by the organisat
sustainability
First sustainable juices roll off conveyor belt at Rotterdam Food Hub
innocent, manufacturer of healthy drinks, opens its own factory, the blender, for the first time since it was founded in 1999. After a trial
energy transition
Horisont Energi and Port of Rotterdam sign memorandum of understanding regarding blue ammonia
SANDNES, Norway, ROTTERDAM, Netherlands – August 5, 2021 - Horisont Energi (EURONEXT: HRGI) and the Port of Rotterdam today announced that t
energy transition
Wattlab makes inland shipping sustainable: stackable hatches with ultra-thin solar panels
In the Rotterdam port, inland shipping vessels are sailing with ultra-thin but robust solar panels on the hatches. This is how the Rotterdam
energy transition
Study for commercial-scale hydrogen imports
TOKYO - 30 July 2021 - Port of Rotterdam Authority, Koole Terminals, Chiyoda Corporation and Mitsubishi Corporation have signed an agreemen
energy transition
Half of Dutch hydrogen projects are located in Rotterdam
Half of the Dutch hydrogen projects are developed in Rotterdam. This is evidenced by the list with projects which was presented by the Nethe
energy transition
Hydrogen road transport gets off to a good start
After the introduction of HyTrucks in the spring of 2020 more and more parties have expressed interest in joining this initiative and workin
energy transition
Broad industry support for Delta Corridor project
The Port of Rotterdam Authority and cross sector industry partners are supporting the development of the Delta Corridor project, comprising
sustainability
TenneT reaches two milestones in connecting 'Hollandse Kust' wind farm to the grid
Alpha - TenneT's high-voltage connection for offshore wind farm Hollandse Kust (I and II) - is ready for use.